(1)障害防止工事の助成(第3条第2項)(1) Subsidy for damage prevention work (Article 3, Paragraph 2)

41 ~ 42 / 65ページ
(単位:千円)
(Unit : 1000 yen)

年度
Fiscal Year
事業内容
Content of Project
規模
Size
総事業費
Project Cost
補助額
Subsidy
昭和50
1975
第二中学校新築併行防音
The Second Junior High School – new construction and concurrent soundproofing
校舎 3,901m2
School building 
538,782118,772
  51
1976
第二中学校講堂併行防音
The Second Junior High School – auditorium construction and concurrent soundproofing
20,48820,462
  52
1977
第二小学校併行防音
The Second Elementary School –concurrent soundproofing
22,55422,072
第五小学校併行防音
The Fifth Elementary School – concurrent soundproofing
74,19564,434

Total
96,74986,506
  53
1978
瑞穂中学校併行防音
Mizuho Junior High School - concurrent soundproofing
15,45015,450
第三小学校併行防音
The Third Elementary School - concurrent soundproofing
25,60324,938
第一小学校建具機能復旧
The First Elementary School – restoration of joinery function
設計
Design
1,2201,064
瑞穂中学校建具機能復旧
Mizuho Junior High School – restoration of joinery function
設計
Design
1,2881,113

Total
43,56142,565
  54
1979
第一小学校建具機能復旧
The First Elementary School – restoration of joinery function
74,68463,474
瑞穂中学校建具機能復旧
Mizuho Junior High School – restoration of joinery function
89,71175,665
第二小学校建具機能復旧
The Second Elementary School – restoration of joinery function
設計
Design
593413
第三小学校建具機能復旧
The Third Elementary School – restoration of joinery function
設計
Design
693495

Total
165,681140,047
  55
1980
第二小学校建具機能復旧
The Second Elementary School – restoration of joinery function
1,384m231,47122,592
第三小学校建具機能復旧
The Third Elementary School – restoration of joinery function
1,830m236,10926,150
第三小学校増築併行防音
The Third Elementary School – extension and concurrent soundproofing
併行  51.35m2
Concurrent
34,84331,990
必要増 41.25m2
To be extended as required
第四小学校建具機能復旧
The Fourth Elementary School – restoration of joinery function
実施設計
Execution design
1,010828
第五小学校増築併行防音
The Fifth Elementary School –extension and concurrent soundproofing
322.623m25,7315,146

Total
109,16486,706
  56
1981
第四小学校建具機能復旧
The Fourth Elementary School – restoration of joinery function
2,524.5m262,29552,334
  57
1982
第四小学校建具機能復旧
The Fourth Elementary School – restoration of joinery function
設計
Design
508236
第二中学校建具併行防音
The Second Junior High School – joinery and concurrent soundproofing
780m249,83145,709

Total
50,33945,945
  58
1983
第四小学校建具機能復旧
The Fourth Elementary School - restoration of joinery function
711m230,78815,066
  59
1984
瑞穂中学校増築併行防音
Mizuho Junior High School – extension and concurrent soundproofing
831.45m252,40026,367
第二中学校増築併行防音
The Second Junior High School – extension and concurrent soundproofing
270m23,7003,441

Total
56,10029,808
  60
1985
第二小学校増築併行防音
The Second Elementary School – extension and concurrent soundproofing
工事・設計
Work/Design
9,4897,160
  61
1986
第一小学校除湿温度保持機能復旧
The First Elementary School – dehumidification and temperature control restoration
設計
Design
3,6502,646
第二小学校除湿温度保持機能復旧
The Second Elementary School – dehumidification and temperature control restoration
設計
Design
1,6001,244
第四小学校増築併行防音
The Fourth Elementary School – extension and concurrent soundproofing
732.02m230,86529,845

Total
36,11533,735
  62
1987
第一小学校除湿温度保持機能復旧
The First Elementary School – dehumidification and temperature control restoration
3,993m2140,801107,573
第二小学校除湿温度保持機能復旧
The Second Elementary School – dehumidification and temperature control restoration
1,667m245,56738,287
第三小学校除湿温度保持機能復旧
The Third Elementary School – dehumidification and temperature control restoration
設計
Design
1,5901,048
第四小学校除湿温度保持機能復旧
The Fourth Elementary School – dehumidification and temperature control restoration
設計
Design
2,0931,623

Total
190,051148,531
  63
1988
箱根ケ崎保育園新築併行防音
Hakonegasaki Nursery – new construction and concurrent soundproofing
686m238,79333,535
第三小学校除湿温度保持機能復旧
The Third Elementary School – dehumidification and temperature control restoration
2,177m256,11039,998
第四小学校除湿温度保持機能復旧
The Fourth Elementary School – dehumidification and temperature control restoration
3,247m277,13064,097
瑞穂中学校除湿温度保持機能復旧
Mizuho Junior High School – dehumidification and temperature control restoration
設計
Design
3,7002,114
瑞穂中学校講堂内装機能復旧
Mizuho Junior High School – restoration of auditorium interior function
746m242,21028,444

Total
217,943168,188

年度
Fiscal Year
事業内容
Content of Project
規模
Size
総事業費
Project Cost
補助額
Subsidy
平成元
1989
第四小学校除湿温度保持機能復旧
The Fourth Elementary School – dehumidification and temperature control restoration
469m226,14022,882
瑞穂中学校除湿温度保持機能復旧
Mizuho Junior High School – dehumidification and temperature control restoration
4,034m2144,47890,866

Total
170,618113,748
  4
1992
デイサービスセンター建設
Day Service Center – construction
設計
Design
2,1791,090
デイサービスセンター建設
Day Service Center – construction
41,99634,877
第二中学校除湿温度保持機能復旧
The Second Junior High School – dehumidification and temperature control restoration
設計
Design
3,6572,500

Total
47,83238,467
  5
1993
第二中学校除湿温度保持機能復旧
The Second Junior High School – dehumidification and temperature control restoration
124,098107,398
  8
1996
石畑保育園併行防音
Ishihata Nursery – concurrent soundproofing
設計
Design
2,0091,755
  9
1997
石畑保育園併行防音
Ishihata Nursery – concurrent soundproofing
37,06332,672
  12
2000
第二小学校除湿温度保持機能復旧
The Second Elementary School – dehumidification and temperature control restoration
設計
Design
1,7331,110
  13
2001
第二小学校除湿温度保持機能復旧
The Second Elementary School – dehumidification and temperature control restoration
748m255,80838,497
  14
2002
第五小学校除湿温度保持機能復旧
The Fifth Elementary School – dehumidification and temperature control restoration
設計
Design
3,2072,619
  15
2003
第五小学校除湿温度保持機能復旧
The Fifth Elementary School – dehumidification and temperature control restoration
1/2工事
1/2 Work
44,23535,309
  16
2004
第五小学校除湿温度保持機能復旧
The Fifth Elementary School – dehumidification and temperature control restoration
2/2工事
2/2 Work
51,56646,255
  17
2005
第二中学校除湿温度保持機能復旧
The Second Junior High School – dehumidification and temperature control restoration
設計
Design
1,9491,536
  18
2006
第二中学校除湿温度保持機能復旧
The Second Junior High School – dehumidification and temperature control restoration
工事
Work
48,48842,542
  19
2007
瑞穂中学校除湿温度保持機能復旧
Mizuho Junior High School – dehumidification and temperature control restoration
設計
Design
3,1052,244
  20
2008
瑞穂中学校除湿温度保持機能復旧
Mizuho Junior High School – dehumidification and temperature control restoration
工事
Work
64,22548,655
  24
2012
第一小学校除湿温度保持機能復旧
The First Elementary School – dehumidification and temperature control restoration
設計
Design
6,7135,034
第三小学校除湿温度保持機能復旧
The Third Elementary School – dehumidification and temperature control restoration
設計
Design
4,9463,214

Total
11,6598,248
  25
2013
第一小学校除湿温度保持機能復旧
The First Elementary School – dehumidification and temperature control restoration
工事
Work
228,554163,139
第三小学校除湿温度保持機能復旧
The Third Elementary School – dehumidification and temperature control restoration
工事
Work
141,66188,291
第二中学校除湿温度保持機能復旧
The Second Junior High School – dehumidification and temperature control restoration
設計
Design
14,91912,778

Total
※25年度分は26年2月末時点の額
* The amount for fiscal year 2013 was calculated at the end of February 2014.
385,134264,208

併行防音工事
施設の新築・増築に併せて行う工事であり、通常の部材を防音建具、吸音用内装へ変更し、空気調和機器を追加したことによる事業費の増額分が補助対象となる。
Concurrent sound insulation work:
The work carried out in coordination with the new construction or extension of the facility, and the subsidy is provided to cover the increased project cost arising from changes to the specific soundproof joinery and the sound absorbing interior from the normal material specifications, and also the addition of air conditioning equipment.
除湿工事
夏季(7~9月)に良好な室内環境を維持するための冷却除湿設備を設置する工事
Dehumidification work:
The installation of a cooling dehumidifier to maintain a good indoor environment in summer (July to September).
温度保持工事
冬季(12~3月)に良好な室内環境を維持するための温風暖房設備を設置する工事
Temperature control work:
The installation of a warm-air heater to maintain a good indoor environment in winter (December to March).
建具機能復旧工事
経年変化により遮音性能が低下した防音建具を交換する工事
Joinery restoration work:
Replacing soundproofing joinery whose sound insulation performance is reduced by aging.
除湿温度保持機能復旧工事
経年変化により性能が低下した空気調和機器を交換する工事であり、近年は従来の単一ダクト方式(集中方式)から、より効率の良い個別空調方式への換装も併せて実施されている。
Dehumidification and temperature control restoration work:
Replacing air conditioning equipment where performance has been reduced by age. Along with this, over recent years, a more efficient individual air conditioning system has been installed by upgrading it from a traditional single-duct system (centralized system).
内装機能復旧工事
経年による剥離、欠落等により吸音機能が低下した内装材の取替等を行う工事
Interior function restoration work:
Replacement, etc. of the age-affected sound-absorbing interior materials deteriorated through peeling, missing materials, etc.