(単位:千円) (Unit : 1000 yen) |
年度 Fiscal Year | 事業内容 Content of Project | 規模 Size | 総事業費 Project Cost | 補助額 Subsidy |
昭和50 1975 | 第二中学校新築併行防音 The Second Junior High School – new construction and concurrent soundproofing | 校舎 3,901m2 School building | 538,782 | 118,772 |
51 1976 | 第二中学校講堂併行防音 The Second Junior High School – auditorium construction and concurrent soundproofing | 20,488 | 20,462 | |
52 1977 | 第二小学校併行防音 The Second Elementary School –concurrent soundproofing | 22,554 | 22,072 | |
第五小学校併行防音 The Fifth Elementary School – concurrent soundproofing | 74,195 | 64,434 | ||
計 Total | 96,749 | 86,506 | ||
53 1978 | 瑞穂中学校併行防音 Mizuho Junior High School - concurrent soundproofing | 15,450 | 15,450 | |
第三小学校併行防音 The Third Elementary School - concurrent soundproofing | 25,603 | 24,938 | ||
第一小学校建具機能復旧 The First Elementary School – restoration of joinery function | 設計 Design | 1,220 | 1,064 | |
瑞穂中学校建具機能復旧 Mizuho Junior High School – restoration of joinery function | 設計 Design | 1,288 | 1,113 | |
計 Total | 43,561 | 42,565 | ||
54 1979 | 第一小学校建具機能復旧 The First Elementary School – restoration of joinery function | 74,684 | 63,474 | |
瑞穂中学校建具機能復旧 Mizuho Junior High School – restoration of joinery function | 89,711 | 75,665 | ||
第二小学校建具機能復旧 The Second Elementary School – restoration of joinery function | 設計 Design | 593 | 413 | |
第三小学校建具機能復旧 The Third Elementary School – restoration of joinery function | 設計 Design | 693 | 495 | |
計 Total | 165,681 | 140,047 | ||
55 1980 | 第二小学校建具機能復旧 The Second Elementary School – restoration of joinery function | 1,384m2 | 31,471 | 22,592 |
第三小学校建具機能復旧 The Third Elementary School – restoration of joinery function | 1,830m2 | 36,109 | 26,150 | |
第三小学校増築併行防音 The Third Elementary School – extension and concurrent soundproofing | 併行 51.35m2 Concurrent | 34,843 | 31,990 | |
必要増 41.25m2 To be extended as required | ||||
第四小学校建具機能復旧 The Fourth Elementary School – restoration of joinery function | 実施設計 Execution design | 1,010 | 828 | |
第五小学校増築併行防音 The Fifth Elementary School –extension and concurrent soundproofing | 322.623m2 | 5,731 | 5,146 | |
計 Total | 109,164 | 86,706 | ||
56 1981 | 第四小学校建具機能復旧 The Fourth Elementary School – restoration of joinery function | 2,524.5m2 | 62,295 | 52,334 |
57 1982 | 第四小学校建具機能復旧 The Fourth Elementary School – restoration of joinery function | 設計 Design | 508 | 236 |
第二中学校建具併行防音 The Second Junior High School – joinery and concurrent soundproofing | 780m2 | 49,831 | 45,709 | |
計 Total | 50,339 | 45,945 | ||
58 1983 | 第四小学校建具機能復旧 The Fourth Elementary School - restoration of joinery function | 711m2 | 30,788 | 15,066 |
59 1984 | 瑞穂中学校増築併行防音 Mizuho Junior High School – extension and concurrent soundproofing | 831.45m2 | 52,400 | 26,367 |
第二中学校増築併行防音 The Second Junior High School – extension and concurrent soundproofing | 270m2 | 3,700 | 3,441 | |
計 Total | 56,100 | 29,808 | ||
60 1985 | 第二小学校増築併行防音 The Second Elementary School – extension and concurrent soundproofing | 工事・設計 Work/Design | 9,489 | 7,160 |
61 1986 | 第一小学校除湿温度保持機能復旧 The First Elementary School – dehumidification and temperature control restoration | 設計 Design | 3,650 | 2,646 |
第二小学校除湿温度保持機能復旧 The Second Elementary School – dehumidification and temperature control restoration | 設計 Design | 1,600 | 1,244 | |
第四小学校増築併行防音 The Fourth Elementary School – extension and concurrent soundproofing | 732.02m2 | 30,865 | 29,845 | |
計 Total | 36,115 | 33,735 | ||
62 1987 | 第一小学校除湿温度保持機能復旧 The First Elementary School – dehumidification and temperature control restoration | 3,993m2 | 140,801 | 107,573 |
第二小学校除湿温度保持機能復旧 The Second Elementary School – dehumidification and temperature control restoration | 1,667m2 | 45,567 | 38,287 | |
第三小学校除湿温度保持機能復旧 The Third Elementary School – dehumidification and temperature control restoration | 設計 Design | 1,590 | 1,048 | |
第四小学校除湿温度保持機能復旧 The Fourth Elementary School – dehumidification and temperature control restoration | 設計 Design | 2,093 | 1,623 | |
計 Total | 190,051 | 148,531 | ||
63 1988 | 箱根ケ崎保育園新築併行防音 Hakonegasaki Nursery – new construction and concurrent soundproofing | 686m2 | 38,793 | 33,535 |
第三小学校除湿温度保持機能復旧 The Third Elementary School – dehumidification and temperature control restoration | 2,177m2 | 56,110 | 39,998 | |
第四小学校除湿温度保持機能復旧 The Fourth Elementary School – dehumidification and temperature control restoration | 3,247m2 | 77,130 | 64,097 | |
瑞穂中学校除湿温度保持機能復旧 Mizuho Junior High School – dehumidification and temperature control restoration | 設計 Design | 3,700 | 2,114 | |
瑞穂中学校講堂内装機能復旧 Mizuho Junior High School – restoration of auditorium interior function | 746m2 | 42,210 | 28,444 | |
計 Total | 217,943 | 168,188 |
年度 Fiscal Year | 事業内容 Content of Project | 規模 Size | 総事業費 Project Cost | 補助額 Subsidy |
平成元 1989 | 第四小学校除湿温度保持機能復旧 The Fourth Elementary School – dehumidification and temperature control restoration | 469m2 | 26,140 | 22,882 |
瑞穂中学校除湿温度保持機能復旧 Mizuho Junior High School – dehumidification and temperature control restoration | 4,034m2 | 144,478 | 90,866 | |
計 Total | 170,618 | 113,748 | ||
4 1992 | デイサービスセンター建設 Day Service Center – construction | 設計 Design | 2,179 | 1,090 |
デイサービスセンター建設 Day Service Center – construction | 41,996 | 34,877 | ||
第二中学校除湿温度保持機能復旧 The Second Junior High School – dehumidification and temperature control restoration | 設計 Design | 3,657 | 2,500 | |
計 Total | 47,832 | 38,467 | ||
5 1993 | 第二中学校除湿温度保持機能復旧 The Second Junior High School – dehumidification and temperature control restoration | 124,098 | 107,398 | |
8 1996 | 石畑保育園併行防音 Ishihata Nursery – concurrent soundproofing | 設計 Design | 2,009 | 1,755 |
9 1997 | 石畑保育園併行防音 Ishihata Nursery – concurrent soundproofing | 37,063 | 32,672 | |
12 2000 | 第二小学校除湿温度保持機能復旧 The Second Elementary School – dehumidification and temperature control restoration | 設計 Design | 1,733 | 1,110 |
13 2001 | 第二小学校除湿温度保持機能復旧 The Second Elementary School – dehumidification and temperature control restoration | 748m2 | 55,808 | 38,497 |
14 2002 | 第五小学校除湿温度保持機能復旧 The Fifth Elementary School – dehumidification and temperature control restoration | 設計 Design | 3,207 | 2,619 |
15 2003 | 第五小学校除湿温度保持機能復旧 The Fifth Elementary School – dehumidification and temperature control restoration | 1/2工事 1/2 Work | 44,235 | 35,309 |
16 2004 | 第五小学校除湿温度保持機能復旧 The Fifth Elementary School – dehumidification and temperature control restoration | 2/2工事 2/2 Work | 51,566 | 46,255 |
17 2005 | 第二中学校除湿温度保持機能復旧 The Second Junior High School – dehumidification and temperature control restoration | 設計 Design | 1,949 | 1,536 |
18 2006 | 第二中学校除湿温度保持機能復旧 The Second Junior High School – dehumidification and temperature control restoration | 工事 Work | 48,488 | 42,542 |
19 2007 | 瑞穂中学校除湿温度保持機能復旧 Mizuho Junior High School – dehumidification and temperature control restoration | 設計 Design | 3,105 | 2,244 |
20 2008 | 瑞穂中学校除湿温度保持機能復旧 Mizuho Junior High School – dehumidification and temperature control restoration | 工事 Work | 64,225 | 48,655 |
24 2012 | 第一小学校除湿温度保持機能復旧 The First Elementary School – dehumidification and temperature control restoration | 設計 Design | 6,713 | 5,034 |
第三小学校除湿温度保持機能復旧 The Third Elementary School – dehumidification and temperature control restoration | 設計 Design | 4,946 | 3,214 | |
計 Total | 11,659 | 8,248 | ||
25 2013 | 第一小学校除湿温度保持機能復旧 The First Elementary School – dehumidification and temperature control restoration | 工事 Work | 228,554 | 163,139 |
第三小学校除湿温度保持機能復旧 The Third Elementary School – dehumidification and temperature control restoration | 工事 Work | 141,661 | 88,291 | |
第二中学校除湿温度保持機能復旧 The Second Junior High School – dehumidification and temperature control restoration | 設計 Design | 14,919 | 12,778 | |
計 Total | ※25年度分は26年2月末時点の額 * The amount for fiscal year 2013 was calculated at the end of February 2014. | 385,134 | 264,208 |
併行防音工事 施設の新築・増築に併せて行う工事であり、通常の部材を防音建具、吸音用内装へ変更し、空気調和機器を追加したことによる事業費の増額分が補助対象となる。 | Concurrent sound insulation work: The work carried out in coordination with the new construction or extension of the facility, and the subsidy is provided to cover the increased project cost arising from changes to the specific soundproof joinery and the sound absorbing interior from the normal material specifications, and also the addition of air conditioning equipment. |
除湿工事 夏季(7~9月)に良好な室内環境を維持するための冷却除湿設備を設置する工事 | Dehumidification work: The installation of a cooling dehumidifier to maintain a good indoor environment in summer (July to September). |
温度保持工事 冬季(12~3月)に良好な室内環境を維持するための温風暖房設備を設置する工事 | Temperature control work: The installation of a warm-air heater to maintain a good indoor environment in winter (December to March). |
建具機能復旧工事 経年変化により遮音性能が低下した防音建具を交換する工事 | Joinery restoration work: Replacing soundproofing joinery whose sound insulation performance is reduced by aging. |
除湿温度保持機能復旧工事 経年変化により性能が低下した空気調和機器を交換する工事であり、近年は従来の単一ダクト方式(集中方式)から、より効率の良い個別空調方式への換装も併せて実施されている。 | Dehumidification and temperature control restoration work: Replacing air conditioning equipment where performance has been reduced by age. Along with this, over recent years, a more efficient individual air conditioning system has been installed by upgrading it from a traditional single-duct system (centralized system). |
内装機能復旧工事 経年による剥離、欠落等により吸音機能が低下した内装材の取替等を行う工事 | Interior function restoration work: Replacement, etc. of the age-affected sound-absorbing interior materials deteriorated through peeling, missing materials, etc. |